在线观看的资源视频的资源视频

  1. Home
  2. Investors
  3. Upstream major projects
  4. 2019 Upstream major projects
  5. Culzean, North Sea, UK

Culzean, North Sea, UK

Completed: 11 June 2019

~30 mboed peak annual average production, net to BP
Culzean, North Sea, UK
"The ground-breaking Culzean development is the latest addition to BP's resilient North Sea portfolio and will play an important role in growing our UK production, expected to reach 200,000 barrels equivalent a day by 2020. I would like to congratulate the project team and our partners for safely achieving first gas ahead of the initial plan and with significant efficiency gains."?
?

Ariel Flores, BP North Sea regional president

Culzean is a 1.2 Tcf High Pressure High Temperature (HPHT) lean gas condensate field located approximately 140 miles east of Aberdeen in Block 22/25a of the Central North Sea in water depths of 300 feet. The project scope includes a stand-alone three bridge-linked platform development with dry gas export via the Central Area Transmission System (CATS) and liquids export via a new-build Floating Storage and Offloading tanker (FSO). The project comprises of six production wells and one produced water re-injection well.?
Location UK - North Sea
Operator Total
Partners Total (50%), BP (32%), JX Nippon (18%)
Project type High pressure gas
Peak annual average production
~100 mboed (gross)
~30 mboed (net)
亚洲人成在线观看的资源视频播放,亚洲中文无码永久免费_变态欧美另类重口味av 在线观看的资源视频在线观看的资源视频_在线观看的资源视频成在线观看的资源视频人网_欧美AV_丁香五月婷婷开心在线观看的资源视频_五月婷婷四月丁香五月_开心五月丁香花在线观看的资源视频 青草在线在线d青草在线_超喷久久人人摸人人搞_热久久在线观看的资源视频在线观看的资源视频99 免费无码在线播放av_色天使色姐妹在线观看的资源视频_色姐妹久久在线观看的资源视频在线av 国产在线观看的资源视频在线观看的资源视频|偷拍|在线观看的资源视频国产区第1页-久草在线在线观看的资源视频在线观看的资源视频, 亚洲人成电影网站色_成av人电影在线观看的资源视频 日本阿v片在线在线观看的资源视频-日本阿v网站在线观看的资源视频-在线观看的资源视频 在线观看的资源视频 日日啪日韩在线_天天啪媽媽鲁播_天天啪久久_男女啪啪啪_夜夜橾天天橾b在线观看的资源视频_日日啪无需播放器